Saturday 27 February 2016

Swing arm fitted to frame, new bearings fitted and adjusted along with new oil seals, spacers, with new swingarm pivot bolts and lots of copper slip ! 




f




Sunday 14 February 2016

Manifolds and gearbox mounts


Fitted the cnc manifolds, these are from Radical Guzzi 40mm, the gearbox mounts supplied from Bormi Racing in Italy, nickel plated. Ready for the frame now ! 











Saturday 6 February 2016

Gearbox to engine fit


Mated up the Raceco rebuilt gearbox to the engine. last time to see the lightened flywheel, ring gear set up before its all bolted together, plus all new clutch internals, standard type. Decided to paint the gearbox black and fitted with either stainless or drilled aluminium nuts, bolts, fillers etc.